[R] GAM Package: preplot.gam taking a **long** time

From: Paul Check <paul_at_openstreet.com>
Date: Mon 14 Aug 2006 - 16:28:48 EST


Hi: I have a large data set that I'm testing and I'm finding that preplot.gam is taking a very long amount of time to compute (like, more than 20 minutes). My machine is 32-bit, Debian unstable, 4GB memory, dual Xeon 3GHz. While the data set is very large, the gam() procedure is able to compute the model without any trouble, in a minute or so. Is there any reason why preplot.gam would be so slow? I am not using "newdata" in the preplot.gam function, so I am assuming that the memory is not a problem. Or could it be?

Is it normal for preplot.gam to take so long on large data sets? I have not had this experience with S-Plus, on a lower quality machine, same data.

Thanks, Paul



R-help@stat.math.ethz.ch mailing list
https://stat.ethz.ch/mailman/listinfo/r-help PLEASE do read the posting guide http://www.R-project.org/posting-guide.html and provide commented, minimal, self-contained, reproducible code. Received on Mon Aug 14 16:33:14 2006

Archive maintained by Robert King, hosted by the discipline of statistics at the University of Newcastle, Australia.
Archive generated by hypermail 2.1.8, at Mon 14 Aug 2006 - 20:22:18 EST.

Mailing list information is available at https://stat.ethz.ch/mailman/listinfo/r-help. Please read the posting guide before posting to the list.